![volume calculator soil volume calculator soil](https://concalculator.com/wp-content/uploads/2019/07/Topsoil-calculator-Rectangular-Area.jpg)
Select Soil Type (same as above) for Swell factor Input – (diameter and depth – inches)Ĥ Input Hole Depth in inches Output (Volume)ģ. It also provides removed soil volume based on selected soil swell factors.
![volume calculator soil volume calculator soil](https://image.slidesharecdn.com/volumecalculation-170813114651/95/contaminated-soil-volume-calculation-20-1024.jpg)
This calculator outputs the hole volume in cubic feet and gallons, soil weight in pounds, based on selected soil densities and input hole dimensions. Circular Hole Soil Volume Weight Calculator If you would like to be kept up-dated on blog articles please sign up for more information here.
![volume calculator soil volume calculator soil](https://cdn.shopify.com/s/files/1/0019/0336/2160/articles/how_to_clean_a_grow_room_or_grow_tent_naturally_800px_1200x1200.jpg)
We love feedback, let us know how you like these calculators. Consequently, these numbers are especially relevant when selecting a shop vacuum as described in the blog article on Selecting The Best Hole Digging Shop Vacuum and for determining the size of a Shop Vacuum for digging holes.įinally, see the blog page on Digging Deep, Straight, Uniform Holes with a Shop-Vac for relevant information. In addition, the calculated numbers can be used to determine the amount of soil that a Shop Vacuum will have to remove in Cubic Feet and Gallons and Soil Weight in pounds. Use the following Circular Hole Soil Volume Weight Calculatorto determine the volume of a round hole in (cubic feet) and (gallons), the weight of the soil removed and the new volume in (cubic feet) and (gallons) based on soil swell factor. PVC Constant Volume Pipe Length CalculatorĬircular Hole Soil Volume Weight Calculator.PVC Pipe Water Volume & Weight Calculator.Rectangular Hole Volume Weight Calculator.Circular Hole Soil Volume Weight Calculator.If the 200 cubic yards of material had a shrink percentage of -10 and you would need to grade or back fill an area with a volume of 90 cubic yards then you would need to keep 100 cubic yards in bank volume of the material and now you would have to haul 140 cubic yards of site. The shrink percentage of the soil is useful for determining the amount of material that you need to keep on site for grading and back filling. With larger excavations the cost due to swell can be significant and will add to your needed excavating budget. At an average of 12 cubic yards hauling capacity of a truck, you are looking at an additional 6 to 7 truck loads. If you are excavating an area with a volume of 200 cubic yards consisting of material with a 40% swell, you are actually looking at removing 280 cubic yards. Excavating soil and piling it up will loosen it and the volume will increase due to void spaces/air pockets added to the material. The volume of excavated soil will increase from its natural state(bank) to its disturbed state (loose).
![volume calculator soil volume calculator soil](https://s.getwinpcsoft.com/screenshots/4883/4883180_1.jpg)
If you need to remove the excavated material it would help to know the swell percentage for the soil you are excavating. The change from bank to compacted is the shrink of the excavated materialīank-Shrink-Compacted The change from bank to loose volume is the swell of the excavated material Loose Volume, disturbed state of the soil.Ĭompacted Volume, volume of the soil after it is compacted. When building a house you are going to deal with 3 stages of the soil volume you are excavating.